Passenger Lifts in Kerala

Passenger lifts for apartment blocks, offices, hotels and retail buildings. Our commercial range runs from 4 to 26 passengers, with simplex, duplex and group control.

Why customers choose Capricorn

Gearless drives on every model

The whole range runs gearless, rope or belt driven, so the ride is quieter and uses less power than older geared equipment.

ARD with UPS as standard

Every model includes an automatic rescue device with UPS. In a power cut the car goes to the nearest landing and the doors open.

Masonry or glass shaft

Models suit a masonry shaft, a metallic shaft or a self supporting glass shaft, so a lift can go into a finished house as well as a new one.

AMC for every brand

We maintain lifts we did not install. If your current supplier has gone quiet, you do not have to replace the lift to get it serviced.

Delivery in three months

Manufacturing starts once you approve the drawing. Delivery is within three months of the order and installation takes 10 to 20 days.

Service visits every two months

After handover our team visits every two months to keep the lift running, on top of the breakdown cover in your contract.

Our range

Capricorn Vertex

Professional Grade Commercial Solution

The Capricorn Vertex is engineered for high-traffic commercial environments, offering reliability, efficiency, and sleek design. Perfect for office buildings, retail centers, and commercial complexes.

Capacity (persons)4,6,8,10,15,18,20,26
CabinSS 304 Silver- Glossy & Hairline finish
DoorSS 304 Covered
DriveGearless Version 1 Rope Driven
ControlsPush Buttons – with Brail
SafetyAdvanced Braking System, Overload Cutoff, Speed Governing, ARD with UPS
SuitsMasonry

Capricorn Presidential

Luxury Commercial Elevator Solution

The Capricorn Presidential represents the pinnacle of commercial elevator luxury. Featuring premium materials, advanced technology, and sophisticated design for prestigious commercial buildings.

Capacity (persons)4,6,8,10,15,18,20,26
CabinWith & Without Shaft, 3 Side Glass Opening with Glass Shaft, Plain Glass, blurred Glass, Tinted Glass, back panel in, RAL – White, Cream, Black,, Grey, any RGB, Coloured SS – Gold, Rose Gold,, Bronze, Black, etc., Designer SS, Wooden Finish MDF, Leather Finish, Mirror
DoorSS 304 Full Vision, With & without Door Frame, RAL, SS Coloured, Tinted option also
DriveGearless Version 3 Motor or Belt Driven
Controls20" LCD Panel with, voice control, gesture Control, Mobile Control
SafetyAdvanced Braking System, Overload Sensor, Speed Governing, ARD with UPS, Drive System 2.0, Intercom, SOS notification on your mobile, Malfunction alert on your, mobile
SuitsWith Glass Shaft, minimum pit 10 cm, minimum droom 2.4m

From enquiry to handover

  1. Enquiry. You tell us the building, the floors and what the lift is for.
  2. Site visit. Our engineers measure the shaft, pit and headroom and check what is possible.
  3. Drawing and approval. You get a detailed drawing of the site and the lift to approve before anything is made.
  4. Manufacturing. The lift is built to the approved drawing.
  5. Pre-installation visit. A second site visit confirms the shaft is ready before delivery.
  6. Delivery and installation. Delivery within three months of the order, installation in 10 to 20 days.
  7. Testing and handover. Full quality and safety check, then handover.
  8. Ongoing support. Technical visits every two months, with AMC options for the longer term.

What it costs

We do not publish a fixed price, because the shaft, the drive and the finish change it too much for a phone estimate to mean anything. What we do is visit, measure the shaft, pit and headroom, and give you a written quotation against a drawing you have approved. If you are comparing us with someone else, check whether their figure includes the shaft work, the electrical supply to the controller, the rescue device and GST, because that is usually where two very different numbers come from.

Size on traffic, not floor count

A twelve floor apartment block with two flats per floor and an eight floor office with forty desks per floor need different lifts. What governs is how many people need to move in the busiest five minutes. For apartments that is the evening. For offices it is the morning arrival.

Group control

Where two or more lifts serve one lobby, a group controller sends the car that will answer soonest instead of the nearest one. On a busy building that decides whether people complain. It costs far less to specify at order stage than to add later.

What the building has to provide

A plumb shaft within tolerance, the specified pit depth and headroom, three phase supply terminated at the controller position, lighting and a socket in the pit and at the machine, and a clear route to deliver the car and rails. Delays on commercial sites are almost always shaft readiness, not equipment.

Commercial passenger range

Passenger capacity4, 6, 8, 10, 15, 18, 20, 26 persons
DriveGearless traction, with or without machine room
Travel speed1.0 to 2.5 m/s depending on rise
ControlSimplex, duplex or group
DoorsAutomatic centre or side opening, 800 to 1100 mm clear
CabinStainless steel, glass, stone or laminate
SafetyAutomatic rescue device, overload detection, door sensors

Frequently asked questions

How many lifts does an apartment building need?
It follows from population and peak traffic, not floor count. As a guide, one lift starts to struggle past about eight floors with several flats per floor. A traffic calculation at design stage settles it.
Machine room or machine-room-less?
Machine-room-less suits most mid rise buildings and saves the headroom structure. A machine room still makes sense for high capacities and long rises.
What speed do we need?
Up to about six floors, 1.0 m/s is enough. Above that, speed should rise with the travel so journey time stays acceptable.
Do we need a firemans lift?
That depends on building height and occupancy under the applicable rules. Confirm it with your architect and the local authority at design stage.

Where we work

We supply, install and maintain lifts across Kochi, Thiruvananthapuram, Kozhikode, Thrissur, Kollam, Kannur, Alappuzha, Palakkad, Kottayam, Malappuram and the rest of Kerala, from our office in Vyttila, Ernakulam.

Request a quotation

Tell us the building, how many floors, and what the lift is for. We visit the site, measure the shaft, pit and headroom, and quote from those measurements.

See our installations on Instagram

@capricornelevators

We post finished installations, cabin finishes and work in progress from sites across Kerala. It is the quickest way to see what a Capricorn lift actually looks like in a real building.

Follow Capricorn Elevators on Instagram